2006-2011 Camry Aurion · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Jun 2009

Versions by build date: Oct 2006 – May 2009 from Jun 2009


1. INSTALL ENGINE OIL COOLER
  1. Clean the oil cooler contact surface on the cooler mounting.

  1. A136292
    Install a new O-ring to the oil cooler.

  1. Install the oil cooler assembly with the union bolt.

    Torque:
    68 N*m{ 693 kgf*cm , 50 ft.*lbf }

  1. A136291
    Install the 2 water by-pass hoses with the bolt, 2 clamps, and 4 clips.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


2. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH

  1. A129649E01
    Install a new gasket as shown in the illustration.

  1. A129641
    Install the exhaust manifold sub-assembly LH with the 6 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


3. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR

  1. A129640
    Install the No. 2 exhaust manifold heat insulator with the 3 bolts.

    Torque:
    8.5 N*m{ 87 kgf*cm , 75 in.*lbf }


4. INSTALL NO. 2 MANIFOLD STAY

  1. A140783
    Install the No. 2 manifold stay with the bolt and nut.

    Torque:
    34 N*m{ 347 kgf*cm , 25 ft.*lbf }


5. INSTALL EXHAUST PIPE ASSEMBLY
(Click here)

6. ADD ENGINE OIL

7. ADD ENGINE COOLANT
  1. Close the radiator drain cock plug and 2 cylinder block drain cock plugs.

    Torque:
    13 N*m{ 130 kgf*cm , 9 ft.*lbf } for cylinder block drain cock plug

  1. Slowly fill the radiator with TOYOTA Super Long Life Coolant (SLLC).

    Specified capacity:
    9.0 liters (9.5 US qts, 7.9 lmp. qts)

    HINT:
    1. TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).
    1. Contact your TOYOTA dealer for further details.

  1. Slowly pour coolant into the radiator reservoir tank until it reaches the FULL line.

  1. Press the inlet and outlet radiator hoses several times by hand, and then check the level of the coolant.
    If the coolant level is low, add coolant.

  1. Install the radiator cap sub-assembly and reservoir tank cap.

  1. Start the engine, and warm it up.

    HINT:
    Adjust the air conditioner set temperature to MAX (HOT).

  1. Stop the engine, and wait until the engine coolant cools down.

  1. Add engine coolant to the FULL line on the radiator reservoir.


8. INSPECT FOR OIL LEAK
  1. Start the engine. Check for engine oil leaks from the connected parts of the oil filter cap and oil filter drain plug.


9. CHECK ENGINE OIL LEVEL
  1. Warm up the engine, stop it and wait 5 minutes. The oil level should be between the dipstick's low level mark and full level mark.
    If the engine oil level is low, check for leakage and add oil up to the full level mark.

    NOTICE:
    Do not add engine oil above the full level mark.


10. REMOVE ENGINE UNDER COVER LH

11. INSTALL ENGINE UNDER COVER RH
← INSTALLATION (Oct 2006 – May 2009)PARTS LOCATION (from Jun 2006) →