ON-VEHICLE INSPECTION
Inspection · Vehicles built from Jun 2006
| INSPECT PRESSURE SENSOR |
Install the manifold gauge set (Click here).
Connect the three 1.5 V dry cell batteries' positive (+) lead to terminal 3 and the negative (-) lead to terminal 1. Then connect the voltmeter's positive (+) lead to terminal 2 and the negative (-) lead to terminal 1. Measure the voltage.

- OK:
- The voltage changes according to refrigerant pressure, as shown in the graph.
