INSTALLATION
Removal / installation · Vehicles built from Jun 2009
Versions by build date: Oct 2006 – May 2009 from Jun 2009
| 1.
INSTALL NO. 1 VACUUM SWITCHING VALVE |
 |
- Install the No. 1 vacuum switching valve with the bolt.
-
Torque:
- 10 N*m{
102 kgf*cm
, 7 ft.*lbf
}
- Disconnect the 2 vacuum hoses and No. 1 vacuum switching valve connector.
| 2.
INSTALL V-BANK COVER SUB-ASSEMBLY
|
 |
- Fit the 3 retainers and install the V-bank cover.