2006-2011 Camry Aurion · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Jun 2009

Versions by build date: Jun 2006 – Sep 2006 Oct 2006 – May 2009 from Jun 2009


1. INSTALL FUEL PRESSURE PULSATION DAMPER ASSEMBLY

  1. A125339E01
    Apply a light coat of gasoline or spindle oil to the O-ring of the fuel pressure pulsation damper.

  1. A125338
    Install the fuel pressure pulsation damper with the 2 bolts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

    NOTICE:
    Make sure that the O-ring is not cracked or jammed before installing the damper.


2. CONNECT FUEL TUBE SUB-ASSEMBLY

HINT:
Connect the metallic type connector (Click here).


3. INSTALL AIR CLEANER CAP SUB-ASSEMBLY
  1. Install the air cleaner filter element onto the air cleaner case.

  1. A135670
    Insert the hinges. Install the air cleaner cap sub-assembly with the 2 bolts.

  1. A236553E01
    Connect the No. 1 air cleaner hose to the throttle body and unfasten the No. 1 air cleaner hose clamp.

    NOTICE:
    1. Match each concave area concavity of the air cleaner hose with the bolt of the throttle body.
    2. Make sure that the hose clamp is at the correct angle.

  1. A146036
    Connect the No. 2 ventilation hose to the air cleaner hose.

  1. A135666E02
    Connect the purge line hose to the clamp (*1).

  1. Connect the 2 purge VSV vacuum hoses (*2).

  1. Connect the purge VSV connector (*3).

  1. Connect the mass air flow meter connector (*4).


4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

5. INSPECT FOR FUEL LEAK

HINT:
Click here.


6. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

  1. A134904
    Install the engine cover with the 2 nuts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

← INSTALLATION (Oct 2006 – May 2009)COMPONENTS (from Jun 2006) →