2006-2011 Camry Aurion · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Jun 2006 – Sep 2006

Versions by build date: Jun 2006 – Sep 2006 Oct 2006 – May 2009 from Jun 2009


1. INSTALL WATER PUMP ASSEMBLY
  1. Remove any old seal packing material from the contact surface.

  1. A094495E05
    Apply a continuous line of seal packing as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Standard seal diameter:
    2.2 to 2.5 mm (0.09 to 0.10 in.)

    NOTICE:
    1. Remove any oil from the contact surface.
    2. The parts must be set within 3 minutes after applying seal packing. Otherwise, the material must be removed and reapplied.

  1. B012052E03
    Install the water pump and clamp bracket with the 4 bolts and 2 nuts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. A094516
    Install the wire of the crankshaft position sensor onto the clamp bracket.

  1. Install the clamp of the crankshaft position sensor onto the water pump.


2. INSTALL WATER PUMP PULLEY

A098715E02
  1. Using SST, install the water pump pulley with the 4 bolts.

    SST
    09960-10010   (09962-01000, 09963-00700)

    Torque:
    26 N*m{ 265 kgf*cm , 19 ft.*lbf }


3. INSTALL GENERATOR ASSEMBLY

  1. A097394E03
    Confirm that the wire harness of the crankshaft position sensor is secured to the wire harness clamp bracket through the back of the rib of the timing chain cover.

  1. A142104E01
    Install the generator assembly with the 2 bolts.

    Torque:
    Bolt A:
    21 N*m{ 215 kgf*cm , 16 ft.*lbf }
    Bolt B:
    52 N*m{ 530 kgf*cm , 38 ft.*lbf }

  1. A135170
    Install the generator wire to terminal B with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Install the clamp bracket with the bolt.

    Torque:
    8.4 N*m{ 86 kgf*cm , 74 in.*lbf }

  1. Attach the clamp and connect the generator connector to the generator.


4. INSTALL V-RIBBED BELT

  1. A114351E03
    Using SST and a 19 mm socket wrench, loosen the V-ribbed belt tensioner arm clockwise, then install the V-ribbed belt.
    SST
    09216-42010  

    NOTICE:
    1. Be sure to connect SST and the tools so that they are in line during use.
    2. When retracting the tensioner, turn it clockwise slowly for 3 seconds or more. Do not apply force rapidly.
    3. After the tensioner is fully retracted, do not apply more force than necessary.

  1. After installing the V-ribbed belt, check that it fits properly in the ribbed grooves. Check to confirm that the belt has not slipped out of the grooves on the bottom of the crank pulley by hand.


5. INSTALL NO. 2 ENGINE MOUNTING BRACKET RH

  1. A134911
    Install the No. 2 engine mounting bracket RH with the 3 bolts.

    Torque:
    52 N*m{ 531 kgf*cm , 38 ft.*lbf }


6. INSTALL ENGINE MOVING CONTROL ROD SUB-ASSEMBLY

  1. A134910
    Install the engine moving control rod with the 3 bolts.

    Torque:
    64 N*m{ 653 kgf*cm , 47 ft.*lbf }

  1. A134909
    Install the ground cable with the bolt.

    Torque:
    8.4 N*m{ 85 kgf*cm , 74 in.*lbf }


7. INSTALL NO. 2 ENGINE MOUNTING STAY RH

  1. A134912
    Install the No. 2 engine mounting stay RH with the 2 bolts.

    Torque:
    64 N*m{ 653 kgf*cm , 47 ft.*lbf }


8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
6.9 N*m{ 70 kgf*cm , 61 in.*lbf }


9. ADD ENGINE COOLANT
  1. Close the radiator drain cock plug and cylinder block drain cock plug.

    Torque:
    13 N*m{ 130 kgf*cm , 9 ft.*lbf } for cylinder block drain cock plug

  1. Slowly fill the radiator with TOYOTA Super Long Life Coolant (SLLC).

    Specified capacity:
    6.7 liters (7.1 US qts, 5.9 lmp. qts)

    HINT:
    1. TOYOTA vehicles are filled with TOYOTA SLLC at the factory. In order to avoid damage to the engine cooling system and other technical problems, only use TOYOTA SLLC or similar high quality ethylene glycol based non-silicate, non-amine, non-nitrite, non-borate coolant with long-life hybrid organic acid technology (coolant with long-life hybrid organic acid technology consists of a combination of low phosphates and organic acids).
    1. Contact your TOYOTA dealer for further details.

  1. Slowly pour coolant into the radiator reservoir tank until it reaches the FULL line.

  1. Press the inlet and outlet radiator hoses several times by hand, and then check the level of the coolant.
    If the coolant level is low, add coolant.

  1. Install the radiator cap sub-assembly and reservoir tank cap.

  1. Start the engine, and warm it up.

    HINT:
    Adjust the air conditioner set temperature to MAX (HOT).

  1. Stop the engine, and wait until the engine coolant cools down.

  1. Add engine coolant to the FULL line on the radiator reservoir.


10. INSPECT FOR COOLANT LEAK

NOTICE:
Before performing each inspection, turn the A/C switch OFF.

CAUTION:
Do not remove the radiator cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.

  1. A135234
    Fill the radiator with coolant and attach a radiator cap tester.

  1. Warm up the engine.

  1. Using a radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf*cm, 17 psi), and check that the pressure does not drop.
    If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and cylinder head.


11. INSTALL ENGINE UNDER COVER LH

12. INSTALL ENGINE UNDER COVER RH
← INSPECTION (from Jun 2006)INSTALLATION (Oct 2006 – May 2009) →