2006-2011 Camry Aurion · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Jun 2009

Versions by build date: Jun 2006 – Sep 2006 Oct 2006 – May 2009 from Jun 2009


1. INSTALL CHARCOAL CANISTER ASSEMBLY

  1. A142720
    Install the 2 bolts, clip and charcoal canister.

    Torque:
    39 N*m{ 397 kgf*cm , 28 ft.*lbf }

  1. A142719
    Connect the 2 hoses.


2. INSTALL FUEL TANK ASSEMBLY

HINT:
(Click here)


3. INSPECT FOR EXHAUST GAS LEAK
← INSTALLATION (Oct 2006 – May 2009)INSPECTION (from Jun 2006) →