INSTALLATION
Removal / installation · Vehicles built from Oct 2006
| 1.
INSTALL AIR COOLED OIL COOLER |
 |
- Install the air cooled oil cooler with the bolt and 2 nuts.
-
Torque:
- 7.0 N*m{
71 kgf*cm
, 62 in.*lbf
}
- HINT:
- After temporarily tightening the bolt, fully tighten the 2 nuts and then bolt.
Connect the 2 oil cooler hoses.
| 2.
ADD AUTOMATIC TRANSAXLE FLUID |
 |
- HINT:
-
Click here.
| 3.
INSTALL ENGINE UNDER COVER LH |
|
| 4.
INSTALL ENGINE UNDER COVER RH |
|