INSTALLATION
Removal / installation · Vehicles built from Jun 2009
Versions by build date: Jun 2006 – Sep 2006 Oct 2006 – May 2009 from Jun 2009
| 1.
INSTALL VENTILATION VALVE SUB-ASSEMBLY |
 |
- Apply adhesive to 2 or 3 threads of the ventilation valve.
- Adhesive:
- Toyota genuine adhesive 1324, three bond 1324 or equivalent
- Using a 22 mm deep socket wrench, install the ventilation valve.
-
Torque:
- 19 N*m{
194 kgf*cm
, 14 ft.*lbf
}
Connect the ventilation hose.
| 2.
INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
|
 |
- Install the engine cover with the 2 nuts.
-
Torque:
- 9.0 N*m{
92 kgf*cm
, 80 in.*lbf
}
| 3.
INSPECT FOR ENGINE OIL LEAK |
|