INSTALLATION
Removal / installation · Vehicles built from Oct 2006
| 1. INSTALL REAR BUMPER ASSEMBLY (w/o Clearance Sonar System) |
without Rear Lower Spoiler:
Engage each claw.

Install the rear bumper assembly with the 6 screws and 2 clips.
Install the 2 rear bumper plates.

with Rear Lower Spoiler:
Engage each claw.

Install the rear bumper assembly with the 6 screws.
Install the 2 rear bumper plates.

| 2. INSTALL REAR BUMPER ASSEMBLY (w/ Clearance Sonar System) |
without Rear Lower Spoiler:
Engage each No. 2 luggage room wire clamp to the rear bumper reinforcement sub-assembly.
Install the grommet.

Connect the connector.
Engage each claw.

Install the rear bumper assembly with the 6 screws and 2 clips.
Install the 2 rear bumper plates.

with Rear Lower Spoiler:
Engage each No. 2 luggage room wire clamp to the rear bumper reinforcement sub-assembly.
Install the grommet.

Connect the connector.
Engage each claw.

Install the rear bumper assembly with the 6 screws.
Install the 2 rear bumper plates.

| 3. INSTALL LUGGAGE COMPARTMENT INNER TRIM COVER RH (w/ Clearance Sonar System) |
Install the luggage compartment inner trim cover RH with the 2 clips.

| 4. INSTALL REAR FLOOR FINISH PLATE (w/ Clearance Sonar System) |
Engage the 7 clips and install the rear floor finish plate.

| 5. INSTALL NO. 1 LUGGAGE COMPARTMENT TRIM HOOK (w/ Clearance Sonar System) |
Install the 2 No. 1 luggage compartment trim hooks with the 2 screws.

| 6. INSTALL SPARE WHEEL COVER ASSEMBLY (w/ Clearance Sonar System) |
| 7. INSTALL SPARE WHEEL COVER CLAMP (w/ Clearance Sonar System) |
| 8. INSTALL LUGGAGE COMPARTMENT FLOOR MAT (w/ Clearance Sonar System) |
| 9. INSTALL REAR QUARTER PANEL MUDGUARD SUB-ASSEMBLY LH (w/o Rear Lower Spoiler) |
Install the rear quarter panel mudguard sub-assembly LH with the 3 screws.

| 10. INSTALL REAR QUARTER PANEL MUDGUARD SUB-ASSEMBLY RH (w/o Rear Lower Spoiler) |
- HINT:
- Use the same procedure for the RH side and LH side.
| 11. INSTALL REAR FLOOR BOARD (w/ Rear Lower Spoiler) |
Install the rear floor board with the 3 nuts, 2 clips and 4 screws.

