Home › TRANSMISSION ยท U250E AUTOMATIC TRANSAXLE › TRANSMISSION WIRE

TRANSMISSION WIRE > INSTALLATION

for Preparation Click here



1. INSTALL TRANSMISSION WIRE


    D030867
  1. Coat a new O-ring of the transmission wire connector with ATF WS and install it to the transmission wire.



    D030866
  1. Install the transmission wire with the bolt.

    Torque:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }

  1. Connect the transmission wire connector.



2. CONNECT TRANSMISSION WIRE


    C135717
  1. Coat the O-ring of the ATF WS temperature sensor with ATF.

  1. Install the ATF temperature sensor with the lock plate and bolt.

    Torque:
    6.6 N*m{ 67 kgf*cm , 58 in.*lbf }

  1. Connect the 7 shift solenoid valve connectors.



3. INSTALL AUTOMATIC TRANSAXLE OIL PAN SUB-ASSEMBLY


    D030865E01
  1. Install the 2 magnets in the oil pan.

  1. Apply adhesive or equivalent to new 18 bolts.

    Adhesive:
    Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent



    C091925
  1. Using a new gasket, install the oil pan to the transaxle case with the 18 bolts.

    Torque:
    7.8 N*m{ 80 kgf*cm , 69 in.*lbf }

    NOTICE:
    Since the bolts should be seal bolts, apply adhesive to the bolts and tighten them within 10 minutes of application.



4. INSTALL AUTOMATIC TRANSAXLE ASSEMBLY

HINT:
Click here.