Home › TRANSMISSION ยท U250E AUTOMATIC TRANSAXLE › UNDERDRIVE PLANETARY GEAR

UNDERDRIVE PLANETARY GEAR > INSPECTION

for Preparation Click here



1. INSPECT UNDERDRIVE PLANETARY GEAR PRELOAD


    C134894E01
  1. Using SST, fix the underdrive planetary gear assembly.

    SST
    09387-00050  
    09495-65040  



    C134895E01
  1. Using SST and a torque wrench, measure the turning torque of the underdrive planetary gear assembly while turning the torque wrench at 60 rpm.

    SST
    09387-00050  
    09495-65040  

    Turning torque at 60 rpm:
    0.28 to 0.89 N*m (2.9 to 9.1 kgf*cm, 2.478 to 7.877 in.*lbf)

    HINT:
    Use a torque wrench with a fulcrum length of 160 mm (6.3 in.).