Home › TRANSMISSION ยท E351 MANUAL TRANSAXLE › FLOOR SHIFT LEVER ASSEMBLY

FLOOR SHIFT LEVER ASSEMBLY > INSTALLATION

for Preparation Click here



1. INSTALL FLOOR SHIFT LEVER ASSEMBLY


    C132955
  1. Install the shift lever assembly with the 4 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }



2. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY


    C132954E01
  1. Connect the control cable to the shift lever retainer.

    NOTICE:
    1. The projecting part of the cable outer should face upward when the shift cable is connected.
    2. After installation, make sure that the cable outer lock is projecting from A as shown in the illustration.



    C132951E01
  1. Connect the end of the shift cable to the shift lever assembly with the clip.

  1. Connect the end of the select cable to the shift lever assembly with a new clip.

    NOTICE:
    1. The serrated part of the select cable point should face upward when the select cable point is connected.
    2. The clip should be installed in the direction as shown in the illustration.



3. INSTALL UPPER CONSOLE REAR PANEL SUB-ASSEMBLY


    B137277
  1. Engage the 3 claws and 5 clips to install the upper console rear panel sub-assembly.



4. INSTALL UPPER CONSOLE PANEL


    B137276
  1. Engage the 2 claws and the 5 clips to install the upper console panel as shown in the illustration.



5. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH


    B226064
  1. Engage the 2 clips and install the No. 2 instrument cluster finish panel garnish.



6. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH


    B226063
  1. Engage the 2 clips and install the No. 1 instrument cluster finish panel garnish.



7. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY


    B137273
  1. Install the shift lever knob sub-assembly.