Home › HEATER & AIR CONDITIONING SYSTEM › AIR CONDITIONING › AIR CONDITIONING SYSTEM

AIR CONDITIONING SYSTEM > Heater Control Panel Power Source Circuit

for Preparation Click here


DESCRIPTION

Battery voltage is supplied to the A/C control assembly (heater control base sub-assembly) through the A/C No. 2 fuse.

WIRING DIAGRAM


E208295E05


INSPECTION PROCEDURE

1.CHECK HARNESS AND CONNECTOR (IG+ - BODY GROUND)


    E124480E02
  1. Disconnect the connector from the A/C control assembly (heater control base sub-assembly).

  1. Measure the voltage according to the value(s) in the table below.

    Standard voltage:
    Tester Connection
    (Symbols)
    Condition
    Specified Condition
    F16-5 (IG+) - Body ground
    Ignition switch: ON
    10 to 14 V
    F16-5 (IG+) - Body ground
    Ignition switch: LOCK
    Below 1 V



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


2.CHECK HARNESS AND CONNECTOR (GND - BODY GROUND)


    E124480E03
  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    (Symbols)
    Condition
    Specified Condition
    F16-3 (GND) - Body ground
    Always
    Below 1 Ω



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

PROCEED TO NEXT CIRCUIT INSPECTION SHOWN IN PROBLEM SYMPTOMS TABLE