AUTOMATIC LIGHT CONTROL SENSOR > INSTALLATION |
| 1. INSTALL AUTOMATIC LIGHT CONTROL SENSOR |
![]() |
Engage the 2 claws and install the automatic light control sensor.
| 2. INSTALL NO. 1 DEFROSTER NOZZLE GARNISH |
![]() |
Connect each connector.
Engage the 4 guides.
Engage the 8 clips and install the No. 1 defroster nozzle garnish.