AIR CONDITIONING PRESSURE SENSOR > ON-VEHICLE INSPECTION |
| 1. INSPECT PRESSURE SENSOR |
Install the manifold gauge set .
![]() |
Connect the three 1.5 V dry cell batterie's positive (+) lead to terminal 3 and the negative (-) lead to terminal 1. Then connect the voltmeter's positive (+) lead to terminal 2 and the negative (-) lead to terminal 1. Measure the voltage.