Home › ENGINE ยท 2GR-FE › STARTING › STARTER

STARTER > INSTALLATION

for Preparation Click here



1. INSTALL STARTER ASSEMBLY


    A133864
  1. Install the starter assembly with the 2 bolts.

    Torque:
    37 N*m{ 380 kgf*cm , 28 ft.*lbf }

  1. Connect the wire harness to terminal 30 and install the nut. Then, attach the terminal cap.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Connect the terminal 50 connector to the starter assembly.



2. INSTALL NO. 1 AIR CLEANER INLET


    A132970
  1. Install the No. 1 air cleaner inlet with the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }



3. INSTALL AIR CLEANER CASE SUB-ASSEMBLY


    A132971
  1. Install the air cleaner case with the 3 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Connect the vacuum hose and hose clamp.



4. INSTALL AIR CLEANER CAP SUB-ASSEMBLY


    A135706
  1. Install the air cleaner cap sub-assembly, and connect the 3 bands.



    A135705E01
  1. Connect the mass air flow meter connector (*1).

  1. Connect the No. 2 ventilation hose (*2).

  1. Connect the hose band (*3).



    A135704
  1. Connect the 3 vacuum hoses.



5. INSTALL AIR CLEANER INLET ASSEMBLY


    A132969
  1. Install the air cleaner inlet with the clamp and 2 bolts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }



6. INSTALL V-BANK COVER SUB-ASSEMBLY


    A132968
  1. Engage the 3 retainers to install the V-bank cover.



7. INSTALL COOL AIR INTAKE DUCT SEAL


    A132967
  1. Install the intake duct seal with the 7 clips.



8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Torque:
6.9 N*m{ 70 kgf*cm , 61 in.*lbf }