Home › BODY › INSTRUMENT PANEL › REAR CONSOLE BOX

REAR CONSOLE BOX > INSTALLATION

for Preparation Click here



1. INSTALL CONSOLE BOX ASSEMBLY


    B134002
  1. Install the 2 screws.



    B134003
  1. Install the console box assembly with the 2 bolts.



2. INSTALL CONSOLE BOX CARPET


    B134004
  1. Install the console box carpet.



3. INSTALL CONSOLE BOX POCKET
  1. Install the console box pocket.



4. INSTALL UPPER CONSOLE REAR PANEL SUB-ASSEMBLY (for Automatic Transaxle)


    B144603E01
  1. Connect the connector and engage the clamp.

  1. Engage the 3 claws and 5 clips to install the upper console rear panel sub-assembly.



5. INSTALL UPPER CONSOLE REAR PANEL SUB-ASSEMBLY (for Manual Transaxle)


    B144604
  1. Engage the 3 claws and 5 clips to install the upper console rear panel sub-assembly.



6. INSTALL FLOOR SHIFT POSITION INDICATOR HOUSING SUB-ASSEMBLY (for Automatic Transaxle)
  1. with Seat Heater System:

    1. Connect each connector.



    B148447
  1. Engage the 6 claws and the 3 clips to install the floor shift position indicator housing sub-assembly.



7. INSTALL UPPER CONSOLE PANEL (for Manual Transaxle)


    B145877
  1. Engage the 2 claws and the 5 clips to install the upper console panel as shown in the illustration.



8. INSTALL NO. 2 INSTRUMENT CLUSTER FINISH PANEL GARNISH


    B144605
  1. Engage the 2 clips and install the No. 2 instrument cluster finish panel garnish.



9. INSTALL NO. 1 INSTRUMENT CLUSTER FINISH PANEL GARNISH


    B144599
  1. Engage the 2 clips and install the No. 1 instrument cluster finish panel garnish.



10. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for Automatic Transaxle)


    B148448
  1. Install the shift lever knob sub-assembly.



11. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (for Manual Transaxle)


    B144601
  1. Install the shift lever knob sub-assembly.