Home › ENGINE ยท 2GR-FE › EMISSION CONTROL › VACUUM SWITCHING VALVE (for EVAP)

VACUUM SWITCHING VALVE (for EVAP) > INSTALLATION

for Preparation Click here



1. INSTALL NO. 1 VACUUM SWITCHING VALVE


    A132953
  1. Install the No. 1 vacuum switching valve with the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }



    A132952E01
  1. Disconnect the 2 vacuum hoses and No. 1 vacuum switching valve connector.



2. INSTALL V-BANK COVER SUB-ASSEMBLY


    A132968
  1. Engage the 3 retainers to install the V-bank cover.