Home › TRANSMISSION · U250E AUTOMATIC TRANSAXLE › SHIFT SOLENOID VALVE

SHIFT SOLENOID VALVE > INSPECTION

for Preparation Click here



1. INSPECT SHIFT SOLENOID VALVE SL3


    G020767E29
  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Specified Condition
    20°C (68°F)
    1 - 2
    5.0 to 5.6 Ω

    If the value is not as specified, replace the shift solenoid valve.

  1. Connect the positive (+) lead to terminal 2 of the solenoid connector, and the negative (-) lead to terminal 1 of the solenoid connector.

    OK:
    The solenoid valve makes an operating sound.

    If the result is not as specified, replace the shift solenoid valve.



2. INSPECT SHIFT SOLENOID VALVE SLT


    G020767E08
  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Specified Condition
    20°C (68°F)
    1 - 2
    5.0 to 5.6 Ω

    If the value is not as specified, replace the shift solenoid valve.

  1. Connect the positive (+) lead to terminal 2 of the solenoid connector, and the negative (-) lead to terminal 1 of the solenoid connector.

    OK:
    The solenoid valve makes an operating sound.

    If the result is not as specified, replace the shift solenoid valve.



3. INSPECT SHIFT SOLENOID VALVE S4


    C113971E01
  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Specified Condition
    20°C (68°F)
    Solenoid Connector (S4) - Solenoid Body (S4)
    11 to 15 Ω

    If the value is not as specified, replace the shift solenoid valve.

  1. Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body.

    OK:
    The solenoid valve makes an operating sound.

    If the result is not as specified, replace the shift solenoid valve.



4. INSPECT SHIFT SOLENOID VALVE SR


    C113977E01
  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Specified Condition
    20°C (68°F)
    Solenoid Connector (SR) - Solenoid Body (SR)
    11 to 15 Ω

    If the value is not as specified, replace the shift solenoid valve.

  1. Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body.

    OK:
    The solenoid valve makes an operating sound.

    If the result is not as specified, replace the shift solenoid valve.



5. INSPECT SHIFT SOLENOID VALVE DSL


    C113970E01
  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Specified Condition
    20°C (68°F)
    Solenoid Connector (DSL) - Solenoid Body (DSL)
    11 to 15 Ω

    If the value is not as specified, replace the shift solenoid valve.

  1. Connect the positive (+) lead to the terminal of the solenoid connector, and the negative (-) lead to the solenoid body.

    OK:
    The solenoid valve makes an operating sound.

    If the result is not as specified, replace the shift solenoid valve.



6. INSPECT SHIFT SOLENOID VALVE SL2


    G020767E28
  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Specified Condition
    20°C (68°F)
    1 - 2
    5.0 to 5.6 Ω

    If the value is not as specified, replace the shift solenoid valve.

  1. Connect the positive (+) lead to terminal 2 of the solenoid connector, and the negative (-) lead to terminal 1 of the solenoid connector.

    OK:
    The solenoid valve makes an operating sound.

    If the result is not as specified, replace the shift solenoid valve.



7. INSPECT SHIFT SOLENOID VALVE SL1


    G020767E46
  1. Measure the resistance according to the value(s) in the table below.

    Standard resistance:
    Tester Connection
    Specified Condition
    20°C (68°F)
    1 - 2
    5.0 to 5.6 Ω

    If the value is not as specified, replace the shift solenoid valve.

  1. Connect the positive (+) lead to terminal 2 of the solenoid connector, and the negative (-) lead to terminal 1 of the solenoid connector.

    OK:
    The solenoid valve makes an operating sound.

    If the result is not as specified, replace the shift solenoid valve.