Home › Power Source / Network ยท 1AZ-FE BATTERY / CHARGING › CHARGING SYSTEM

CHARGING SYSTEM > PRECAUTION

for Preparation Click here



1.Check that the battery cables are connected to the correct terminals.

2.Disconnect the battery cables when the battery is given a quick charge.

3.Do not perform tests with a high voltage insulation resistance tester.

4.Never disconnect the battery while the engine is running.

5.Check that the charging cable nuts are tightened on terminal B of the generator and the engine room relay block and junction block assembly.