Home
›
Engine / Hybrid System ยท 1AZ-FE
›
EMISSION CONTROL
›
PURGE VALVE
PURGE VALVE > INSTALLATION
for Preparation
Click here
1. INSTALL PURGE VSV
Install the purge VSV.
Connect the connector and 2 fuel vapor feed hoses.
Text in Illustration
*a
2 to 7 mm (0.0787 to 0.276 in.)
*b
90°
*c
Rear Side
*d
Upper Side
*e
RH Side
*f
Paint mark