Home › Engine / Hybrid System ยท 2GR-FE › EMISSION CONTROL › PURGE VALVE

PURGE VALVE > REMOVAL

for Preparation Click here



1. REMOVE V-BANK COVER SUB-ASSEMBLY


    A255420
  1. Hold the front of the V-bank cover sub-assembly and raise it to disengage the 2 retainers on the front of the V-bank cover sub-assembly. Continue to raise the V-bank cover sub-assembly to disengage the retainer on the rear of the V-bank cover sub-assembly and remove the V-bank cover sub-assembly.

    NOTICE:
    Attempting to disengage both front and rear retainers at the same time may cause the V-bank cover sub-assembly to break.



2. REMOVE PURGE VSV


    A255333
  1. Disconnect the connector and wire harness clamp.

  1. Disconnect the 2 fuel vapor feed hoses.



    A255334
  1. Remove the bolt and purge VSV.