Home › Engine / Hybrid System ยท 1AZ-FE › EMISSION CONTROL › PCV VALVE

PCV VALVE > INSTALLATION

for Preparation Click here



1. INSTALL VENTILATION VALVE SUB-ASSEMBLY
  1. Apply adhesive to 2 or 3 threads of the ventilation valve sub-assembly.

    Adhesive:
    Toyota genuine adhesive 1324, three bond 1324 or equivalent

  1. Using a ball joint lock nut wrench (22 mm), install the ventilation valve sub-assembly.

    Torque:
    19 N*m{ 194 kgf*cm , 14 ft.*lbf }

    NOTICE:
    Use the torque value compensation formula to calculate the torque value for use when a torque wrench is combined with a tool such as a ball joint lock nut wrench (Click here).



2. CONNECT NO. 2 VENTILATION HOSE
  1. Connect the No. 2 ventilation hose to the ventilation valve sub-assembly.



3. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
  1. Install the No. 1 engine cover sub-assembly with the 2 nuts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }