Home › Engine / Hybrid System ยท 2GR-FE › EMISSION CONTROL › CANISTER

CANISTER > INSTALLATION

for Preparation Click here



1. INSTALL CHARCOAL CANISTER ASSEMBLY
  1. Install the charcoal canister assembly with the 2 bolts and clip.

    Torque:
    39 N*m{ 398 kgf*cm , 29 ft.*lbf }

  1. Connect the air line hose and purge line hose.

  1. Connect the wire harness clamp.



2. INSTALL FUEL TANK ASSEMBLY
(Click here)