Home › Engine / Hybrid System · 2GR-FE › ENGINE CONTROL › SFI SYSTEM

SFI SYSTEM > ECM Power Source Circuit

for Preparation Click here


DESCRIPTION

When the engine switch is turned on (IG), battery voltage is applied to the IGSW terminal of the ECM. The output signal from the MREL terminal of the ECM causes current to flow to the coil of the No. 1 integration relay (EFI MAIN relay), closing the contact and supplying power to terminals +B and +B2 of the ECM.

WIRING DIAGRAM


A266396E02


INSPECTION PROCEDURE

NOTICE:
Inspect the fuses for circuits related to this system before performing the following inspection procedure.

1.CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)
  1. Disconnect the ECM connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:

    Tester Connection
    Condition
    Specified Condition
    E26-49 (E1) - Body ground
    Always
    Below 1 Ω



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


2.CHECK TERMINAL VOLTAGE (IGSW VOLTAGE)


    A255690E12
  1. Disconnect the ECM connector.

  1. Turn the engine switch on (IG).

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Switch Condition
    Specified Condition
    A25-32 (IGSW) - Body ground
    Engine switch on (IG)
    11 to 14 V

    Text in Illustration 
    *a
    Front view of wire harness connector
    (to ECM)



NG
Go to step 6
OK


3.INSPECT NO. 1 INTEGRATION RELAY (EFI MAIN RELAY)
  1. Inspect the No. 1 integration relay (EFI MAIN relay) (Click here).



NG
REPLACE NO. 1 INTEGRATION RELAY (EFI MAIN RELAY) (Click here)
OK


4.CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - ECM)
  1. Remove the No. 1 integration relay from the engine room relay block and junction block assembly.

  1. Disconnect the ECM connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:

    Tester Connection
    Condition
    Specified Condition
    1C-9 - A25-2 (+B)
    Always
    Below 1 Ω
    1C-10 - A25-3 (+B2)
    Always
    Below 1 Ω
    1C-7 - A25-46 (MREL)
    Always
    Below 1 Ω
    1C-9 or A25-2 (+B) - Body ground
    Always
    10 kΩ or higher
    1C-10 or A25-3 (+B2) - Body ground
    Always
    10 kΩ or higher
    1C-7 or A25-46 (MREL) - Body ground
    Always
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


5.CHECK TERMINAL VOLTAGE (POWER SOURCE OF NO. 1 INTEGRATION RELAY)


    A256527E02
  1. Remove the No. 1 integration relay from the engine room relay block and junction block assembly.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Condition
    Specified Condition
    1B-1 - Body ground
    Always
    11 to 14 V

    Text in Illustration 
    *a
    Front view of wire harness connector
    (to No. 1 Integration Relay)



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - NO. 1 INTEGRATION RELAY)
OK

PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE (Click here)  

6.INSPECT NO. 1 INTEGRATION RELAY (IG2 RELAY)
  1. Inspect the No. 1 integration relay (IG2 relay) (Click here).



NG
REPLACE NO. 1 INTEGRATION RELAY (IG2 RELAY) (Click here)
OK


7.CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - ECM)
  1. Remove the No. 1 integration relay from the engine room relay block and junction block assembly.

  1. Disconnect the ECM connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:

    Tester Connection
    Condition
    Specified Condition
    1C-1 - A25-32 (IGSW)
    Always
    Below 1 Ω
    1C-1 or A25-32 (IGSW) - Body ground
    Always
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


8.CHECK TERMINAL VOLTAGE (POWER SOURCE OF NO. 1 INTEGRATION RELAY)


    A256530E04
  1. Remove the No. 1 integration relay from the engine room relay block and junction block assembly.

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Condition
    Specified Condition
    1D-3 - Body ground
    Always
    11 to 14 V

    Text in Illustration 
    *a
    Front view of wire harness connector
    (to No. 1 Integration Relay)



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - NO. 1 INTEGRATION RELAY)
OK


9.CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - BODY GROUND)
  1. Remove the No. 1 integration relay from the engine room relay block and junction block assembly.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:

    Tester Connection
    Condition
    Specified Condition
    1E-2 - Body ground
    Always
    Below 1 Ω



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


10.CHECK HARNESS AND CONNECTOR (CERTIFICATION ECU (SMART KEY ECU ASSEMBLY) - NO. 1 INTEGRATION RELAY)
  1. Disconnect the certification ECU (smart key ECU assembly) connector.

  1. Remove the No. 1 integration relay from the engine room relay block and junction block assembly.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:

    Tester Connection
    Condition
    Specified Condition
    A43-9 (IG2D) - 1C-8
    Always
    Below 1 Ω
    A43-9 (IG2D) or 1C-8 - Body ground
    Always
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

GO TO SMART ENTRY AND START SYSTEM (Click here)