Home › Engine / Hybrid System ยท 2GR-FE › LUBRICATION › OIL PUMP

OIL PUMP > INSTALLATION

for Preparation Click here



1. INSTALL TIMING CHAIN CASE OIL SEAL


    A125109E04
  1. Using SST, tap in a new oil seal until its surface is flush with the timing chain case edge.

    SST
    09223-22010  
    09506-35010  

    NOTICE:
    1. Keep the lip free from foreign matter.
    2. Do not tap on the oil seal at an angle.
    3. Make sure that the oil seal edge does not stick out of the timing chain case.

    HINT:
    Tap in the oil seal so that it is positioned within 1.0 mm from the edge of the timing chain case.

  1. Apply a light coat of MP grease to the timing chain cover oil seal lip.



2. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY


  1. Apply seal packing in a continuous line to the engine unit as shown in the following illustration.


    A132228E12


    Text in Illustration 
    *a
    Seal Diameter: 3.0 mm or more
    V100135
    Seal Packing

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Seal diameter:
    3.0 mm (0.118 in.)

    NOTICE:
    1. Be sure to clean and degrease the contact surfaces, especially the surfaces indicated by C in the illustration.
    2. If there is oil on the contact surfaces, wipe them with an oil-free cloth before applying seal packing.
    3. Install the chain cover within 3 minutes.
    4. Do not start the engine for at least 2 hours after installing.



  1. Apply seal packing in a continuous line to the timing chain cover as shown in the following illustration.


    A187885E01


    Text in Illustration 
    *a
    Dashed line area
    (Seal packing: Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent)
    *b
    Continuous line area
    (Seal packing: Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent)
    *c
    Alternate long and short dashed line area
    (Seal packing: Toyota Genuine Seal Packing 1282B, Three Bond 1282B or equivalent)
    *d
    Diagonal line area
    (Seal packing: Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent)
    V100135
    Be sure to apply seal packing
    -
    -

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent
    Toyota Genuine Seal Packing 1282B, Three Bond 1282B or equivalent

    NOTICE:
    1. If there is oil on the contact surfaces, wipe them with an oil-free cloth before applying seal packing.
    2. Install the chain cover within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.
    3. Do not start the engine for at least 2 hours after installing.


    Seal Packing Application Chart 
    Area
    Seal Packing Diameter
    Application Position from Inside Seal Line
    Continuous Line Area
    4.5 mm or more (0.177 in.)
    1.0 to 2.0 mm (0.0394 to 0.0787 in.)
    Alternate Long and Short Dashed Line Area
    3.5 mm or more (0.138 in.)
    2.0 to 3.0 mm (0.0787 to 0.118 in.)
    Dashed Line Area
    3.5 mm or more (0.138 in.)
    3.0 to 4.0 mm (0.118 to 0.158 in.)
    Diagonal Line Area
    6.0 mm or more (0.236 in.)
    5.0 mm (0.197 in.)



    A128017
  1. Install a new gasket.



    A132229E07
  1. Align the oil pump drive rotor spline and the crankshaft as shown in the illustration. Install the spline and chain cover to the crankshaft.
    Text in Illustration 
    *1
    Drive Rotor Spline
    *2
    Crankshaft



    A187948E01
  1. Temporarily tighten the timing chain cover with the 23 bolts and 2 nuts.
    Text in Illustration 
    *1
    Nut
    Bolt Length 
    Item
    Length
    Bolt A
    40 mm (1.57 in.)
    Bolt B
    55 mm (2.17 in.)
    Bolt C
    25 mm (0.984 in.)

    NOTICE:
    Make sure that there is no oil on the threads of bolt B and C.



    A187949E01
  1. Fully tighten the bolts in this order: Area 1 and Area 2.
    Text in Illustration 
    *a
    Area 1
    *b
    Area 2
    *c
    Area 3
    *d
    Area 4

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Fully tighten the bolts and nuts in Area 3.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    HINT:
    Tighten the bolts and nuts from top to bottom as shown in the illustration.

  1. Fully tighten the bolts in Area 4.

    Torque:
    Bolt A:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }

    Torque:
    Except bolt A:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    HINT:
    Tighten the bolts from bottom to top as shown in the illustration.



3. INSTALL OIL PAN SUB-ASSEMBLY


  1. Using an E8 "TORX" socket wrench, install the 2 stud bolts.


    A134962E07


    Text in Illustration 
    *a
    Timing Chain Cover
    *b
    Lower Cylinder Block

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



    A129684
  1. Install 2 new O-rings.



    A187880E01
  1. Apply seal packing in a continuous line as shown in the illustration.
    Text in Illustration 
    *a
    Seal Diameter

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Seal diameter:
    3.0 to 4.0 mm (0.118 to 0.157 in.)

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the oil pan sub-assembly within 3 minutes of after applying seal packing.
    3. Do not start the engine for at least 2 hours after installation.



    A129682E04
  1. Install the oil pan sub-assembly with the 16 bolts and 2 nuts.
    Text in Illustration 
    *1
    Nut

    Torque:
    Bolts A:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }
    Except bolts A:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



4. INSTALL OIL STRAINER SUB-ASSEMBLY


    A134963E07
  1. Using an E6 "TORX" socket wrench, install the 2 stud bolts as shown in the illustration.
    Text in Illustration 
    *a
    Timing Chain Cover

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }



    A129681E02
  1. Install a new gasket and the oil strainer sub-assembly with the bolt and 2 nuts.
    Text in Illustration 
    *1
    Nut

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



5. INSTALL NO. 2 OIL PAN SUB-ASSEMBLY


    A134964E02
  1. Using an E6 "TORX" socket wrench, install the 2 stud bolts as shown in the illustration.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }



    A187881E01
  1. Apply seal packing in a continuous line as shown in the illustration.
    Text in Illustration 
    *a
    Seal Diameter

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Seal diameter:
    3.0 to 4.0 mm (0.118 to 0.157 in.)

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the No. 2 oil pan sub-assembly within 3 minutes of applying seal packing.
    3. Do not start the engine for at least 2 hours after installation.



    A129680E02
  1. Install the No. 2 oil pan sub-assembly with the 16 bolts and 2 nuts.
    Text in Illustration 
    *1
    Nut

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



6. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY


    A187882
  1. Apply seal packing as shown in the illustration.
    Text in Illustration 
    V100135
    Seal Packing

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the cylinder head cover sub-assembly within 3 minutes of applying seal packing.
    3. Do not start the engine for at least 2 hours after installation.



    A129699
  1. Install 3 new gaskets as shown in the illustration.

  1. Install a new cylinder head cover gasket to the cylinder head cover sub-assembly.



    A129679E01
  1. Install the cylinder head cover sub-assembly with the 12 bolts and a new seal washer.

    Torque:
    Bolts A:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }
    Except bolts A:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    HINT:
    After tightening all bolts, check the tightening torque of 1 and 11. Retighten the bolt if necessary.



7. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY LH


    A187886
  1. Apply seal packing as shown in the illustration.
    Text in Illustration 
    V100135
    Seal Packing

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    1. Remove any oil from the contact surfaces.
    2. Install the cylinder head cover sub-assembly LH within 3 minutes of applying seal packing.
    3. Do not start the engine for at least 2 hours after installation.



    A129705
  1. Install 3 new gaskets as shown in the illustration.

  1. Install a new No. 2 cylinder head cover gasket to the cylinder head cover sub-assembly LH.



    A129678E04
  1. Install the cylinder head cover sub-assembly LH with the 12 bolts and a new seal washer.

    Torque:
    Bolts A:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }
    Except bolts A:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    HINT:
    After tightening all bolts, check the tightening torque of 1 and 10. Retighten the bolt if necessary.



8. INSTALL WATER INLET HOUSING


    A129675E01
  1. Install 2 new O-rings.

    HINT:
    Apply a small amount of water or soapy water to the O-ring (A) shown in the illustration before installation.



    A137975E02
  1. Install the 2 stud bolts.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }



    A134879E03
  1. Install the water inlet housing with the 2 bolts and nut.
    Text in Illustration 
    *1
    Nut
    *2
    Bolt

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    NOTICE:
    Be careful that the O-ring does not get caught between the parts.

  1. Connect the No. 1 water by-pass hose.

  1. Apply adhesive around the drain cock assembly.

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

  1. Install the drain cock assembly to the water inlet housing.

    Torque:
    30 N*m{ 306 kgf*cm , 22 ft.*lbf }

  1. Install the drain cock plug to the drain cock assembly.

    Torque:
    13 N*m{ 130 kgf*cm , 9 ft.*lbf }

  1. Install a new gasket to the thermostat.



    A134896E01
  1. Align the thermostat jiggle valve with the upper stud bolt, and insert the thermostat in the water inlet housing.

    HINT:
    The jiggle valve may be set within 10° of either side of the prescribed position.



    A129673
  1. Install the water inlet with the 2 nuts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



9. INSTALL NO. 1 FRONT ENGINE MOUNTING BRACKET LH


    A134961E03
  1. Using an E8 "TORX" socket wrench, install the 2 stud bolts.
    Text in Illustration 
    *1
    Stud Bolt

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Install the No. 1 front engine mounting bracket LH with the 6 bolts.

    Torque:
    54 N*m{ 550 kgf*cm , 40 ft.*lbf }

    NOTICE:
    1. Install the water inlet and No. 1 front engine mounting bracket LH within 15 minutes of installing the timing chain cover sub-assembly.
    2. Do not start the engine for at least 2 hours after installation.



10. INSTALL CRANKSHAFT PULLEY
  1. Align the pulley set key with the key groove of the pulley, and slide on the pulley.



    A208602E03
  1. Using SST, install the pulley bolt.

    SST
    09213-70011   (09213-70020)
    09330-00021  

    Torque:
    250 N*m{ 2550 kgf*cm , 184 ft.*lbf }

    Text in Illustration 
    *a
    Hold
    V100135
    Turn



11. INSTALL NO. 1 OIL PIPE
  1. Make sure that there is no foreign matter on the mesh of the oil control valve filter LH.

    NOTICE:
    Do not touch the mesh when installing the oil control valve filter LH.



    A135726E02
  1. Install the oil control valve filter LH to the oil pipe union. Install new gaskets and temporarily install the No. 1 oil pipe (on the head cover side) with the union.
    Text in Illustration 
    *1
    Oil Pipe Union

  1. Install a new gasket and temporarily install the No. 1 oil pipe (on the cylinder head side) with the union.

  1. Tighten the oil pipe union (on the head cover side).

    Torque:
    65 N*m{ 663 kgf*cm , 48 ft.*lbf }

  1. Tighten the oil pipe union (on the cylinder head side).

    Torque:
    65 N*m{ 663 kgf*cm , 48 ft.*lbf }

    NOTICE:
    If the link that connects the gaskets is broken, remove the connecting link by using side cutters or a similar tool.



12. INSTALL OIL PIPE
  1. Make sure that there is no foreign matter on the mesh of the oil control valve filter RH.

    NOTICE:
    Do not touch the mesh when installing the oil control valve filter RH.



    A200607E05
  1. Install the oil control valve filter RH to the oil pipe union. Install new gaskets and temporarily install the oil pipe (on the head cover side) with the union.
    Text in Illustration 
    *1
    Oil Pipe Union

  1. Install a new gasket and temporarily install the oil pipe (on the cylinder head side) with the union.

  1. Install the bolt (A) to the cylinder head.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Tighten the oil pipe union (on the head cover side).

    Torque:
    65 N*m{ 663 kgf*cm , 48 ft.*lbf }

  1. Tighten the oil pipe union (on the cylinder head side).

    Torque:
    65 N*m{ 663 kgf*cm , 48 ft.*lbf }

    NOTICE:
    If the link that connects the gaskets is broken, remove the connecting link by using side cutters or a similar tool.



13. INSTALL CRANK POSITION SENSOR


    A191152E02
  1. Apply a light coat of engine oil to the O-ring on the crank position sensor.
    Text in Illustration 
    *1
    O-ring

  1. Install the crank position sensor with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the crank position sensor connector.



14. INSTALL NO. 1 VACUUM SWITCHING VALVE
  1. Install the No. 1 vacuum switching valve with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



15. INSTALL WATER PUMP PULLEY
  1. Temporarily install the water pump pulley with the 4 bolts.

  1. Using SST, hold the water pump pulley.

    SST
    09960-10010   (09962-01000, 09963-00700)

  1. Tighten the 4 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



16. INSTALL NO. 2 IDLER PULLEY SUB-ASSEMBLY
  1. Install the idler pulley cover plate, No. 2 idler pulley sub-assembly and No. 2 idler pulley cover plate with the bolt.

    Torque:
    54 N*m{ 550 kgf*cm , 40 ft.*lbf }



17. INSTALL NO. 2 TIMING GEAR COVER
  1. Install the No. 2 timing gear cover with the 2 bolts.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }



18. INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE


    A171897
  1. Apply a light coat of engine oil to a new O-ring and install it to the engine oil level dipstick guide.



    A192400
  1. Install the engine oil level dipstick guide with the bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



19. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY


    A129644E01
  1. Temporarily install the V-ribbed belt tensioner assembly with the 5 bolts.

    HINT:
    Each bolt length is as follows:
    A: 70 mm (2.76 in.)
    B: 33 mm (1.30 in.)

  1. Install the V-ribbed belt tensioner assembly by tightening the bolt 1 and bolt 2 in the order shown in the illustration.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }

  1. Tighten the other bolts.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }



20. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH


    A129649
  1. Install a new gasket as shown in the illustration.
    Text in Illustration 
    V100136
    Engine Front



    A207618E01
  1. Install the exhaust manifold sub-assembly LH with the 6 nuts in the order shown in the illustration.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



21. INSTALL NO. 2 EXHAUST MANIFOLD HEAT INSULATOR
  1. Install the No. 2 exhaust manifold heat insulator with the 3 bolts.

    Torque:
    8.5 N*m{ 87 kgf*cm , 75 in.*lbf }



22. INSTALL NO. 2 MANIFOLD STAY


    A140783E03
  1. Tighten the bolt and nut in the order shown in the illustration.

    Torque:
    34 N*m{ 347 kgf*cm , 25 ft.*lbf }



23. INSTALL NO. 2 ENGINE OIL LEVEL DIPSTICK GUIDE
  1. Install a new O-ring to the No. 2 engine oil level dipstick guide.

  1. Apply a light coat of engine oil to the O-ring.

  1. Push in the No. 2 engine oil level dipstick guide end into the engine oil level dipstick guide.

  1. Install the No. 2 engine oil level dipstick guide with the bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Install the engine oil level dipstick.



24. INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH


    A129650
  1. Install a new gasket as shown in the illustration.
    Text in Illustration 
    V100136
    Engine Front



    A129637E01
  1. Install the exhaust manifold sub-assembly RH with the 6 nuts in the order shown in the illustration.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



25. INSTALL IGNITION COIL ASSEMBLY
  1. Install the 6 ignition coils with the 6 bolts.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

    HINT:
    Perform "Inspection After Repairs" after replacing the ignition coil assembly (Click here).

  1. Connect the 6 ignition coil connectors.

  1. Connect the 2 wire harness clamps.

  1. Install the nut.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



26. INSTALL THROTTLE BODY BRACKET

NOTICE:
Do not apply oil to the bolt as listed below:
Oil Application Prohibited Bolt
Bolt for throttle body bracket and cylinder head cover

  1. Install the throttle body bracket with the bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



27. INSTALL NO. 1 SURGE TANK STAY

NOTICE:
Do not apply oil to the bolt as listed below:
Oil Application Prohibited Bolt
Bolt for No. 1 surge tank stay and cylinder head cover

  1. Install the No. 1 surge tank stay with the bolt.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



28. INSTALL INTAKE AIR SURGE TANK ASSEMBLY

NOTICE:
Do not apply oil to the bolts as listed below
Oil Application Prohibited Bolt
Intake Air Surge Tank Assembly and Intake Manifold
No. 1 Surge Tank Stay and Intake Air Surge Tank Assembly
Throttle Body Bracket and Intake Air Surge Tank Assembly

  1. Install 3 new gaskets to the intake air surge tank assembly.

  1. Temporarily install the intake air surge tank assembly with the 4 bolts and 2 nuts.



    A255341E01
  1. Using a 5 mm hexagon socket wrench, in several steps, uniformly tighten the 4 bolts and 2 nuts in the order shown in the illustration.

    Torque:
    Bolt:
    18 N*m{ 184 kgf*cm , 13 ft.*lbf }
    Nut:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }

  1. Install the throttle body bracket and No. 1 surge tank stay with the 2 bolts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Install the vacuum hose clamp with the bolt.

    Torque:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }

  1. Connect the connector to the intake air control valve assembly.

  1. Connect the 2 water by-pass hoses and fuel vapor feed hose.

  1. Connect the connector and wire harness clamp to the throttle body assembly.

  1. Connect the hose clamp and union to check valve hose.

  1. Connect the ventilation hose.



29. INSTALL ENGINE HANGERS


    A129635E18
  1. Remove the 4 bolts and 2 engine hangers.
    Text in Illustration 
    *1
    No. 1 engine hanger
    *2
    No. 2 engine hanger
    *a
    Bank 1
    *b
    Bank 2



30. REMOVE ENGINE STAND


31. INSTALL DRIVE PLATE AND RING GEAR SUB-ASSEMBLY
  1. Using SST, hold the crankshaft pulley.

    SST
    09213-70011   (09213-70020)
    09330-00021  

  1. Clean the 8 bolts and 8 bolt holes.



    A114342
  1. Install the front drive plate spacer.

    HINT:
    Align the pin of the front drive plate spacer with the pin hole of the crankshaft.



    A192405E03
  1. Install the drive plate and ring gear sub-assembly and rear drive plate spacer onto the crankshaft.
    Text in Illustration 
    *1
    Drive Plate
    *2
    Rear Spacer
    V100135
    Transaxle Side



    P000601E12
  1. Apply adhesive to 2 or 3 threads of each bolt.
    Text in Illustration 
    *1
    Adhesive

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent



    A132243E01
  1. In several steps, uniformly install and tighten the 8 bolts in the sequence shown in the illustration.

    Torque:
    83 N*m{ 846 kgf*cm , 61 ft.*lbf }

    NOTICE:
    Do not start the engine for at least an hour after installing the drive plate.



32. INSTALL AUTOMATIC TRANSAXLE ASSEMBLY
(Click here)