Home › Engine / Hybrid System ยท 2GR-FE › ENGINE CONTROL › ACTIVE CONTROL ENGINE MOUNT

ACTIVE CONTROL ENGINE MOUNT > INSTALLATION

for Preparation Click here



1. INSTALL FRONT ENGINE MOUNTING INSULATOR ASSEMBLY
  1. Install the front engine mounting insulator assembly with the 3 nuts.

    Torque:
    52 N*m{ 530 kgf*cm , 38 ft.*lbf }

  1. Install the hole plug.

  1. Connect the duty vacuum switching valve connector and 2 clamps.



2. INSTALL TRANSVERSE ENGINE MOUNTING BRACKET


    A255003E01
  1. Install the transverse engine mounting bracket with the 4 bolts.
    Text in Illustration 
    *1
    Bolt A
    *2
    Bolt B

    Torque:
    Bolt A:
    87 N*m{ 887 kgf*cm , 64 ft.*lbf }
    Bolt B:
    64 N*m{ 653 kgf*cm , 47 ft.*lbf }

  1. Install the transmission oil cooler with the 2 bolts.

    Torque:
    14 N*m{ 138 kgf*cm , 10 ft.*lbf }



3. INSTALL RADIATOR ASSEMBLY
(Click here).