VALVE BODY ASSEMBLY > INSPECTION |
| 1. INSPECT SHIFT SOLENOID VALVE (SLT, SL1, SL2) |
![]() |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 1 - 2 | 20°C (68°F) | 5.0 to 5.6 Ω |
| *a | Component without harness connected Shift Solenoid Valve (SLT, SL1, SL2) |
Connect a positive (+) battery lead with a 21 W bulb to terminal 2 and a negative (-) battery lead to terminal 1 of the solenoid valve connector, and check the operation of the valve.
| 2. INSPECT SHIFT SOLENOID VALVE DSL |
![]() |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| Solenoid Connector (DSL) - Solenoid Body (DSL) | 20°C (68°F) | 11 to 13 Ω |
| *a | Shift Solenoid Valve DSL |
Connect a positive (+) battery lead to the terminal of the solenoid connector, and a negative (-) battery lead to the solenoid body, and check the operation of the valve.
| 3. INSPECT SHIFT SOLENOID VALVE S4 |
![]() |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| Solenoid Connector (S4) - Solenoid Body (S4) | 20°C (68°F) | 11 to 15 Ω |
| *a | Shift Solenoid Valve S4 |
Connect a positive (+) battery lead to the terminal of the solenoid connector, and a negative (-) battery lead to the solenoid body, and check the operation of the valve.