Home › Drivetrain · U660E AUTOMATIC TRANSMISSION / TRANSAXLE › AUTOMATIC TRANSAXLE SYSTEM

DTC    P0705    Transmission Range Sensor Circuit Malfunction (PRNDL Input)

for Preparation Click here


DESCRIPTION

The park/neutral position switch assembly detects the shift lever position and sends signals to the TCM.

DTC No.
DTC Detection Condition
Trouble Area
P0705
(A) Any 2 or more signals of the following are ON simultaneously (2-trip detection logic)
  1. NSW input signal is ON.
  2. R input signal is ON.
  3. D input signal is ON.
(B) All switches are OFF simultaneously for NSW, R and D.
  1. Open or short in park/neutral position switch assembly circuit
  2. Park/neutral position switch assembly
  3. TCM

MONITOR DESCRIPTION

These DTCs indicate a problem with the park/neutral position switch assembly and the wire harness in the park/neutral position switch assembly circuit.
The park/neutral position switch assembly detects the shift lever position and sends signals to the TCM.
For safety, the park/neutral position switch assembly detects the shift lever position so that the engine can be started only when the shift lever is in P or N.
The park/neutral position switch assembly sends a signal to the TCM according to the shift lever position (R or D). The TCM determines that there is a problem with the switch or related parts if it receives more than 1 position signal simultaneously. The TCM will turn on the MIL and store the DTC.

MONITOR STRATEGY


Related DTCs
P0705: Park/neutral position switch/Verify switch input
Required sensors/Components
Park/neutral position switch assembly
Frequency of operation
Continuous
Duration
Condition (A): 2 sec.
Condition (B): 60 sec.
MIL operation
2 driving cycles
Sequence of operation
None

TYPICAL ENABLING CONDITIONS


The monitor will run whenever the following DTCs are not present
None
Engine switch
on (IG)
Battery voltage
10.5 V or more

TYPICAL MALFUNCTION THRESHOLDS

  1. When either condition below is met: Condition (A) or (B)
  2. Condition (A)
    1. When 2 or more of the following signals are input at the same time:

      Park neutral position switch (NSW)
      ON
      R position switch
      ON
      D position switch
      ON
    Condition (B)
    1. When all conditions below are met:

      Park neutral position switch (NSW)
      OFF
      R position switch
      OFF
      D position switch
      OFF

COMPONENT OPERATING RANGE


Park/neutral position switch assembly
The park/neutral position switch sends only one signal to the TCM

WIRING DIAGRAM


C245544E01


INSPECTION PROCEDURE

NOTICE:
Perform the universal trip to clear permanent DTCs (Click here).

HINT:
Using the Techstream to read the Data List allows the values or states of switches, sensors, actuators and other items to be read without removing any parts. This non-intrusive inspection can be very useful because intermittent conditions or signals may be discovered before parts or wiring is disturbed. Reading the Data List information early in troubleshooting is one way to save diagnostic time.

NOTICE:
In the table below, the values listed under "Normal Condition" are reference values. Do not depend solely on these reference values when deciding whether a part is faulty or not.

  1. Warm up the engine.
  2. Turn the engine switch off.
  3. Connect the Techstream to the DLC3.
  4. Turn the engine switch on (IG).
  5. Turn the Techstream on.
  6. Enter the following menus: Powertrain / ECT / Data List.
  7. According to the display on the Techstream, read the Data List.

    Tester Display
    Measurement Item / Range
    Normal Condition
    Diagnostic Note
    Neutral Position SW Signal
    PNP switch status / ON or OFF
    1. ON: Shift lever is in P or N
    2. OFF: Shift lever is not in P or N
    When the shift lever position displayed on the Techstream differs from the actual position, adjustment of the PNP switch or the shift cable may be incorrect.
    Shift SW Status (R Range)
    PNP switch status / ON or OFF
    1. ON: Shift lever is in R
    2. OFF: Shift lever is not in R
    When the shift lever position displayed on the Techstream differs from the actual position, adjustment of the PNP switch or the shift cable may be incorrect.
    Shift SW Status (D Range)
    PNP switch status / ON or OFF
    1. ON: Shift lever is in D or S
    2. OFF: Shift lever is not in D or S
    When the shift lever position displayed on the Techstream differs from the actual position, adjustment of the PNP switch or the shift cable may be incorrect.
1.CHECK HARNESS AND CONNECTOR (BATTERY - PARK/NEUTRAL POSITION SWITCH)


    C190067E22
  1. Disconnect the park/neutral position switch assembly connector.

  1. Turn the engine switch on (IG).

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Switch Condition
    Specified Condition
    E4-1 (RB) - Body ground
    Engine switch on (IG)
    11 to 14 V

    Text in Illustration 
    *a
    Front view of wire harness connector
    (to Park/Neutral Position Switch Assembly)



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK


2.CHECK HARNESS AND CONNECTOR (OUTPUT SIGNAL)


    C190067E23
  1. Turn the engine switch on (IG).

  1. Measure the voltage according to the value(s) in the table below.

    Standard Voltage:
    Tester Connection
    Switch Condition
    Specified Condition
    E4-4 (B) - Body ground
    Engine switch on (IG)
    11 to 14 V

    Text in Illustration 
    *a
    Front view of wire harness connector
    (to Park/Neutral Position Switch Assembly)



NG
Go to step 5
OK


3.INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY


    C179092E16
  1. Disconnect the park/neutral position switch assembly connector.

  1. Measure the resistance according to the value(s) in the table below when the shift lever is moved to each position.

    Standard Resistance:
    Tester Connection
    Shift Lever Position
    Specified Condition
    E4-4 (B) - E4-9 (L)
    P or N
    Below 1 Ω
    Except P and N
    10 kΩ or higher
    E4-1 (RB) - E4-2 (RL)
    R
    Below 1 Ω
    Except R
    10 kΩ or higher
    E4-1 (RB) - E4-7 (DL)
    D, S, "+" or "-"
    Below 1 Ω
    Except D, S, "+" and "-"
    10 kΩ or higher

    Text in Illustration 
    *a
    Component without harness connected
    (Park/Neutral Position Switch Assembly)



NG
REPLACE PARK/NEUTRAL POSITION SWITCH ASSEMBLY (Click here)
OK


4.CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - TCM)


    C189544E65
  1. Connect the park/neutral position switch Assembly connector.

  1. Disconnect the TCM connectors.

  1. Turn the engine switch on (IG), and measure the voltage according to the value(s) in the table below when the shift lever is moved to each position.

    Standard Voltage:
    Tester Connection
    Shift Lever Position
    Specified Condition
    E7-15 (R) - Body ground
    R
    11 to 14 V*
    Except R
    Below 1 V
    E7-16 (D) - Body ground
    D, S, "+" or "-"
    11 to 14 V
    Except D, S, "+" and "-"
    Below 1 V

    Text in Illustration 
    *a
    Front view of wire harness connector
    (to TCM)

    HINT:
    *: The voltage will drop slightly due to lighting up of the back up light.



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

REPLACE TCM (Click here)  

5.CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - TCM)
  1. Turn the engine switch off.

  1. Disconnect the TCM connector.

  1. Disconnect the park/neutral position switch Assembly connector.

  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance (Check for Open):
    Tester Connection
    Condition
    Specified Condition
    E4-4 (B) - E7-11 (NSW)
    Always
    Below 1 Ω

    Standard Resistance (Check for Short):
    Tester Connection
    Condition
    Specified Condition
    E4-4 (B) or E7-11 (NSW) - Body ground and other terminals
    Always
    10 kΩ or higher



NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK

REPLACE TCM (Click here)