Home › Engine / Hybrid System ยท 2GR-FE › EMISSION CONTROL › PURGE VALVE

PURGE VALVE > INSTALLATION

for Preparation Click here



1. INSTALL PURGE VSV
  1. Install the purge VSV with the bolt.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }

  1. Connect the 2 fuel vapor feed hoses.

  1. Connect the wire harness clamp and connector.



2. INSTALL V-BANK COVER SUB-ASSEMBLY
  1. Fit the 3 retainers and install the V-bank cover sub-assembly.