1.INSPECT SHIFT SOLENOID VALVE SL
| *a | Shift Solenoid Valve SL |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| Solenoid Connector (SL) - Solenoid Body (SL) | 20°C (68°F) | 11 to 15 Ω |
If the value is not as specified, replace the shift solenoid valve.
Connect a positive (+) lead from the battery to the terminal of the solenoid connector, and a negative (-) lead to the solenoid body, and check the operation of the valve.
When using battery voltage during the inspection, do not bring the positive (+) and negative (-) tester probes too close to each other as a short circuit may occur.
The valve moves and makes an operating sound.
If the operation cannot be done as specified, replace the shift solenoid valve.
2.INSPECT SHIFT SOLENOID VALVE (SLT, SLU, SL1, SL2, SL3, SL4)
| *a | Component without harness connected
(Shift Solenoid Valve SLT, SLU, SL1, SL2, SL3, SL4) |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1 - 2 | 20°C (68°F) | 5.0 to 5.6 Ω |
If the value is not as specified, replace the shift solenoid valve.
Connect a positive (+) lead from the battery with a 21 W bulb to terminal 2 and a negative (-) lead to terminal 1 of the solenoid valve connector, and check the operation of the valve.
When using battery voltage during the inspection, do not bring the positive (+) and negative (-) tester probes too close to each other as a short circuit may occur.
The valve moves and makes an operating sound.
If the operation cannot be done as specified, replace the shift solenoid valve.