Home › Engine / Hybrid System › 2AR-FXE EMISSION CONTROL › CANISTER
RM2040EQ _51 Engine / Hybrid System _014695 2AR-FXE EMISSION CONTROL _0074919 CANISTER A

2AR-FXE EMISSION CONTROL  CANISTER  INSTALLATION  


PROCEDURE

Hide 77740 1.INSTALL CHARCOAL CANISTER ASSEMBLY

a.

Install the charcoal canister assembly with the 2 bolts and clip.

Torque:
39 N*m (398 kgf*cm, 29 ft.*lbf)


b.

Connect the air line hose and purge line hose.

A296102
5.875,0.469 6.188,0.625 0.313,0.156 10 *a 5.396,1.698 5.708,1.854 0.313,0.156 10 *b 5.729,1.885 6.042,2.042 0.313,0.156 10 *c 1.49,2.156 1.802,2.313 0.313,0.156 10 *d 1.302,1.219 1.615,1.375 0.313,0.156 10 *e
*a 2 to 7 mm (0.079 to 0.276 in.) *b 90°
*c Front Side *d 180°
*e Upper Side - -



c.

Connect the wire harness clamp.


Hide 77100 2.INSTALL FUEL TANK ASSEMBLY