Home › Power Source / Network › POWER DISTRIBUTION › MAIN BODY ECU
RM2040EQ _57 Power Source / Network _014720 POWER DISTRIBUTION _0075038 MAIN BODY ECU A

POWER DISTRIBUTION  MAIN BODY ECU  INSTALLATION  


PROCEDURE

Hide 89221 1.INSTALL MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU)

NOTICE:
·

Make sure that no foreign matter gets on the connecting surfaces.

·

Do not touch the ECU connector.



a.
B286748
1.219,1.25 0.542,1.25 false 0.365,1.167 0.688,1.5 0.323,0.333 10 false *1 0.146,2.406 0.479,2.76 0.333,0.354 10 false *a
*1 Housing Sidewall
*a 20°


Insert the main body ECU (multiplex network body ECU) up to the position where it contacts the housing sidewall of the guide as shown in the illustration.

HINT:

Make sure to keep the angle 20° or more as shown in the illustration.



b.
B286749
0.865,1.344 0.344,1.344 false 2.042,1.479 3.104,1.479 false 0.156,1.25 0.5,1.49 0.344,0.24 10 false *1 3.104,1.385 3.365,1.667 0.26,0.281 10 false *2
*1 Housing Sidewall
*2 Junction Block Fuse


Slide the guide of the main body ECU (multiplex network body ECU) along the housing sidewall so that it contacts the junction block fuses as shown in the illustration.


c.
B286750
2.281,1.25 3.156,1.25 false 3.167,1.167 3.427,1.406 0.26,0.24 10 false *a
*a Side A Contact Portion


While keeping the main body ECU (multiplex network body ECU) in contact with side A of the junction block (axis of rotation), rotate it downward as shown in the illustration.


d.
B286751
0.979,1.104 0.469,1.104 false 0.25,1.021 0.552,1.313 0.302,0.292 10 false *a
*a Push Area


Press the push area until the claw engages to install the main body ECU (multiplex network body ECU).

NOTICE:
·

Make sure to press only the push area.

·

Confirm the engagement of the main body ECU (multiplex network body ECU) and junction block by listening for the lock sound.



HINT:

If a lock sound cannot be heard, visually check the lock part engagement. The engagement can also be confirmed if the main body ECU (multiplex network body ECU) and junction block are flush.



Hide 82730 2.INSTALL INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY

a.
B279023

Engage the claw to install the connector as shown in the illustration.

NOTICE:

Be sure to engage the connector securely.



b.
B279021

Engage the claw to lock the connector lock as shown in the illustration.


c.
B279019

Engage the claw to connect the connector as shown in the illustration.

NOTICE:

Be sure to engage the connector securely.



d.

Engage the claw to install the wiring harness clamp bracket.


e.

Install the nut.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


f.

Install the instrument panel junction block assembly with the bolt and nut.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


g.

Connect the 5 connectors.

NOTICE:

Be sure to engage each connector securely.



Hide 89681A 3.INSTALL POWER MANAGEMENT CONTROL ECU