Home › Vehicle Exterior › EXTERIOR PANELS / TRIM › ENGINE HOOD MOULDING

ENGINE HOOD MOULDING > INSTALLATION

for Preparation Click here



1. INSTALL FRONT HOOD MOULDING PAD
  1. Wipe off any tape adhesive residue with cleaner.



  1. Install a new front hood moulding pad so that it is centered within the markings on the front hood molding.


    B283406E01


    Text in Illustration 
    *a
    Marking
    *b
    Standard end location



2. INSTALL FRONT HOOD MOULDING PAD LH
  1. Wipe off any tape adhesive residue with cleaner.



    B283407E01
  1. Install a new front hood moulding pad LH so that it is centered within the markings on the front hood molding.
    Text in Illustration 
    *a
    Marking
    *b
    Standard end location



3. INSTALL FRONT HOOD MOULDING PAD RH

HINT:
Use the same procedure as for the LH side.



4. INSTALL FRONT HOOD MOULDING ASSEMBLY
  1. Install the front hood moulding assembly with the 7 nuts.