Home › Vehicle Exterior › HORN › HORN

HORN > INSTALLATION

for Preparation Click here



1. INSTALL HIGH PITCHED HORN ASSEMBLY
  1. Install the high pitched horn assembly with the bolt.

    Torque:
    20 N*m{ 199 kgf*cm , 14 ft.*lbf }

  1. Connect the connector.



2. INSTALL LOW PITCHED HORN ASSEMBLY
  1. Install the low pitched horn assembly with the bolt.

    Torque:
    20 N*m{ 199 kgf*cm , 14 ft.*lbf }

  1. Connect the connector.



3. INSTALL COOL AIR INTAKE DUCT SEAL
  1. Install the cool air intake duct seal with the 9 clips.