Home › Engine / Hybrid System ยท 2AR-FE › ENGINE MECHANICAL › DRIVE BELT

DRIVE BELT > INSTALLATION

for Preparation Click here



1. INSTALL V-RIBBED BELT


    A194911E02
  1. Set the V-ribbed belt onto each part as shown in the illustration except the water pump pulley.
    Text in Illustration 
    *1
    Crankshaft
    *2
    Tensioner
    *3
    Generator
    *4
    Water Pump
    *5
    Cooler Compressor

  1. Loosen the V-ribbed belt by turning the belt tensioner clockwise.

  1. Set the V-ribbed belt onto the water pump pulley.

    NOTICE:
    Make sure that the belt is attached to each pulley. In particular, make sure that the belt is securely fitted into the grooves of the crankshaft pulley.



2. INSTALL FRONT FENDER APRON SEAL RH


3. INSTALL ENGINE UNDER COVER RH


4. INSTALL FRONT WHEEL OPENING EXTENSION PAD RH


5. INSTALL FRONT WHEEL RH

Torque:
103 N*m{ 1049 kgf*cm , 76 ft.*lbf }