DTC P070513 Transmission Range Sensor "A" Circuit Open |
DTC P070562 Transmission Range Sensor "A" Signal Compare Failure |
| DTC No. | DTC Detection Condition | Trouble Area |
| P070513 | 1. Diagnosis Condition 2. Malfunction Status 3. Malfunction Time 4. Other
|
|
| P070562 | 1. Diagnosis Condition 2. Malfunction Status 3. Malfunction Time 4. Other
|
|

| DATA LIST |
| Tester Display | Measurement Item/Range | Normal Condition | Diagnostic Note |
| Neutral Position SW | Park/neutral position switch status / ON or OFF |
| When the shift lever position displayed on the GTS differs from the actual position, the adjustment of the park/neutral position switch or shift cable may be incorrect. |
| Shift SW Status (P Range) | Park/neutral position switch status / ON or OFF |
| When the shift lever position displayed on the GTS differs from the actual position, the adjustment of the park/neutral position switch or shift cable may be incorrect. |
| Shift SW Status (R Range) | Park/neutral position switch status / ON or OFF |
| When the shift lever position displayed on the GTS differs from the actual position, the adjustment of the park/neutral position switch or shift cable may be incorrect. |
| Shift SW Status (N Range) | Park/neutral position switch status / ON or OFF |
| When the shift lever position displayed on the GTS differs from the actual position, the adjustment of the park/neutral position switch or shift cable may be incorrect. |
| Shift SW Status (D Range) | Park/neutral position switch status / ON or OFF |
| When the shift lever position displayed on the GTS differs from the actual position, the adjustment of the park/neutral position switch or shift cable may be incorrect. |
| 1.CHECK HARNESS AND CONNECTOR (BATTERY - PARK/NEUTRAL POSITION SWITCH ASSEMBLY) |
Disconnect the E85 park/neutral position switch assembly connector.
Turn the engine switch on (IG).
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| E85-1 (RB) - Body ground | Engine switch on (IG) | 11 to 14 V |
|
| ||||
| OK | |
| 2.CHECK HARNESS AND CONNECTOR (OUTPUT SIGNAL) |
Turn the engine switch on (IG).
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| E85-4 (B) - Body ground | Engine switch on (IG) | 11 to 14 V |
|
| ||||
| OK | |
| 3.INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY |
![]() |
Disconnect the E85 park/neutral position switch assembly connector.
| *a | Component without harness connected (Park/Neutral Position Switch Assembly) |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 4 (B) - 9 (L) | Shift lever in P or N | Below 1 Ω |
| Shift lever not in P or N | 10 kΩ or higher | |
| 1 (RB) - 3 (PL) | Shift lever in P | Below 1 Ω |
| Shift lever not in P | 10 kΩ or higher | |
| 1 (RB) - 8 (NL) | Shift lever in N | Below 1 Ω |
| Shift lever not in N | 10 kΩ or higher | |
| 1 (RB) - 2 (RL) | Shift lever in R | Below 1 Ω |
| Shift lever not in R | 10 kΩ or higher | |
| 1 (RB) - 7 (DL) | Shift lever in D, S, "+" or "-" | Below 1 Ω |
| Shift lever not in D, S, "+" or "-" | 10 kΩ or higher |
|
| ||||
| OK | |
| 4.CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH ASSEMBLY - ECM) |
Connect the E85 park/neutral position switch assembly connector.
Disconnect the E96 ECM connector.
Turn the engine switch on (IG).
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| E96-64 (P) - Body ground | Shift lever in P | 11 to 14 V |
| Shift lever not in P | Below 1 V | |
| E96-65 (N) - Body ground | Shift lever in N | 11 to 14 V |
| Shift lever not in N | Below 1 V | |
| E96-35 (R) - Body ground | Shift lever in R | 11 to 14 V* |
| Shift lever not in R | Below 1 V | |
| E96-34 (D) - Body ground | Shift lever in D, S, "+" or "-" | 11 to 14 V |
| Shift lever not in D, S, "+" or "-" | Below 1 V |
|
| ||||
| OK | ||
| ||
| 5.CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH ASSEMBLY - ECM) |
Turn the engine switch off.
Disconnect the A84 ECM connector.
Disconnect the E85 park/neutral position switch assembly connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| E85-4 (B) - A84-57 (NSW) | Always | Below 1 Ω |
| E85-4 (B) or A84-57 (NSW) - Body ground and other terminals | Always | 10 kΩ or higher |
|
| ||||
| OK | ||
| ||