THROTTLE BODY > INSTALLATION |
| 1. INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY |
Install a new gasket to the intake manifold.
Install the fuel tube bracket with the bolt.
Install the throttle with motor body assembly with the 4 bolts.
Connect the throttle body connector.
Connect the fuel tube to the clamp.
Connect the No. 2 water by-pass hose to the throttle with motor body assembly.
Connect the water by-pass hose to the throttle with motor body assembly.
| 2. INSTALL AIR CLEANER CAP SUB-ASSEMBLY |
Install the air cleaner cap sub-assembly with the 2 clamps.
Install the air cleaner hose with the hose clamp.
Connect the ventilation hose to the cylinder head cover.
Install the fuel vapor feed hose to the air cleaner hose.
Connect the mass air flow meter connector and 2 wire harness clamps to the air cleaner cap sub-assembly.
Connect the vacuum switching valve assembly to the air cleaner hose.
| 3. ADD ENGINE COOLANT |
Tighten the radiator drain cock plug by hand.
![]() |
Slowly fill the radiator assembly with engine coolant.
| *a | Code Mark |
| Code Mark "M" | 6.9 liters (7.3 US qts, 6.1 Imp. qts) |
| Code Mark "G" | 7.0 liters (7.4 US qts, 6.2 Imp. qts) |
| Code Mark "Z" | 7.3 liters (7.7 US qts, 6.4 Imp. qts) |
Remove the reserve tank cap.
Slowly pour engine coolant into the radiator reserve tank assembly until it reaches the full line.
Squeeze the No. 1 radiator hose and No. 2 radiator hose several times by hand, and then check the level of the engine coolant.
If the engine coolant level is low, add engine coolant.
Install the radiator cap sub-assembly and reserve tank cap.
Bleed air from the cooling system.
Warm up the engine until the thermostat opens. While the thermostat is open, circulate the engine coolant for several minutes.
Maintain the engine speed at 2500 to 3000 rpm.
Squeeze the No. 1 radiator hose and No. 2 radiator hose several times by hand to bleed air from the cooling system.
Stop the engine, and wait until the engine coolant cools down.
Add engine coolant to the full line on the radiator reserve tank assembly.
| 4. INSPECT FOR COOLANT LEAK |
![]() |
Fill the radiator with coolant and attach a radiator cap tester.
Warm up the engine.
Using a radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf/cm2, 17 psi), and check that the pressure does not drop.
If the pressure drops, check the hoses, radiator and water pump for leaks. If no external leaks are found, check the heater core, cylinder block and cylinder head.
| 5. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY |
Fit the 3 retainers and install the No. 1 engine cover sub-assembly.
| 6. INSTALL ENGINE UNDER COVER RH |
| 7. INSTALL ENGINE UNDER COVER LH |
| 8. INSTALL FRONT WHEEL OPENING EXTENSION PAD RH |
| 9. INSTALL FRONT WHEEL OPENING EXTENSION PAD LH |
| 10. PERFORM INITIALIZATION |
Turn the ignition switch to ON without operating the accelerator pedal.
Connect the tester to the DLC3 and clear the DTCs (Click here).
Perform the "Inspection After Repair" (Click here).
Start the engine and check that the MIL is not illuminated. After the engine is warmed up, check that the idle speed is within the specified range when the A/C is switched off.
| Condition | Engine Idle Speed |
| A/C switched off | 610 to 710 rpm |
Enter the following menus: Powertrain / Engine and ECT / Data List / All Data /Throttle Sensor Position. Fully depress the accelerator pedal and check that the value is 60% or more.
Perform a road test and confirm that there are no abnormalities.