Home › Engine / Hybrid System ยท 6AR-FSE › EMISSION CONTROL › PCV VALVE

PCV VALVE > INSTALLATION

for Preparation Click here



1. INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY)
  1. Clean and degrease the threads of the PCV valve (ventilation valve sub-assembly).

  1. Apply adhesive to 2 or 3 threads of the PCV valve (ventilation valve sub-assembly).

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

  1. Using a 19 mm deep socket wrench, install the PCV valve (ventilation valve sub-assembly) to the cylinder head cover sub-assembly.

    Torque:
    27 N*m{ 275 kgf*cm , 20 ft.*lbf }

    NOTICE:
    Do not start the engine for at least 1 hour after installation.



2. CONNECT NO. 2 VENTILATION HOSE
  1. Connect the No. 2 ventilation hose to the PCV valve (ventilation valve sub-assembly) and slide the clip to secure it.



3. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
  1. Engage the 3 grommets to install the No. 1 engine cover sub-assembly.