RADIO ANTENNA CORD (for TMC, TMMR Made) > INSTALLATION |
| 1. INSTALL NO. 2 ANTENNA CORD SUB-ASSEMBLY |
Apply new double-sided tape.

| *A | w/o Sliding Roof | *B | w/ Sliding Roof |
| *C | w/ Television Antenna | - | - |
| *a | Double-sided Tape Size | - | - |
![]() | Front | ![]() | Double-sided Tape |
| Area | Dimension |
| A | 1.0 mm (0.0394 in.) |
| B | 10.0 mm (0.394 in.) |
Remove the old double-sided tape from the roof headlining assembly.
Prepare the appropriate amount of new double-sided tape.
Apply the double-sided tape to the roof headlining while aligning the tape with the markings on the roof headlining assembly.
Peel off the release paper from the double-sided tape.
Install the No. 2 antenna cord sub-assembly to the roof headlining assembly from the front of the vehicle.

| *A | w/o Sliding Roof | *B | w/ Sliding Roof |
| *C | w/ Television Antenna | - | - |
| *a | Adjustment Area | *b | Protrusion |
![]() | Front | ![]() | Tape |
![]() | Marking Tape | - | - |
Put the pieces of tape back to the positions shown in the illustration in order to secure the antenna cord to the roof headlining assembly.
| 2. INSTALL NO. 1 ROOF SILENCER PAD (w/o Sliding Roof) |
| 3. INSTALL ROOF HEADLINING ASSEMBLY |
| 4. INSTALL ANTENNA CORD SUB-ASSEMBLY |
for LHD:
Engage the 8 clamps to install the antenna cord sub-assembly.
for RHD:
Engage the 10 clamps to install the antenna cord sub-assembly.
| 5. INSTALL NO. 2 SIDE DEFROSTER NOZZLE DUCT |
![]() |
Engage the 2 claws.
Install the No. 2 side defroster nozzle duct with the screw <C>.
| 6. INSTALL NO. 3 HEATER TO REGISTER DUCT (for LHD) |
![]() |
Install the No. 3 heater to register duct with the 3 screws <C>.
Install the clip.
| 7. INSTALL HEATER TO REGISTER DUCT ASSEMBLY (for RHD) |
Engage the heater to register duct assembly to the ion generator assembly.
![]() |
Install the heater to register duct assembly with the 3 screws <C>.
Install the clip.
| 8. INSTALL INSTRUMENT PANEL SAFETY PAD ASSEMBLY |