VALVE BODY ASSEMBLY > INSPECTION |
| 1. INSPECT SHIFT SOLENOID VALVE SL |
![]() |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| Solenoid Connector (SL) - Solenoid Body (SL) | 20°C (68°F) | 11 to 15 Ω |
| *a | Shift Solenoid Valve SL |
Connect a positive (+) lead from the battery to the terminal of the solenoid connector, and a negative (-) lead to the solenoid body, and check the operation of the valve.
| 2. INSPECT SHIFT SOLENOID VALVE (SLT, SLU, SL1, SL2, SL3, SL4) |
![]() |
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
| 1 - 2 | 20°C (68°F) | 5.0 to 5.6 Ω |
| *a | Component without harness connected (Shift Solenoid Valve SLT, SLU, SL1, SL2, SL3, SL4) |
Connect a positive (+) lead from the battery with a 21 W bulb to terminal 2 and a negative (-) lead to terminal 1 of the solenoid valve connector, and check the operation of the valve.