ENGINE HOOD MOULDING > INSTALLATION |
| 1. INSTALL FRONT HOOD MOULDING PAD |
Clean the front hood moulding.
Remove any remaining double-sided tape from the front hood moulding.
Wipe off any tape adhesive residue with cleaner.
Install a new front hood moulding pad.
Remove the release paper from a new front hood moulding pad.
Install the front hood moulding pad so that it is centered within the markings on the front hood molding.

| *a | Marking | *b | Standard end location |
| 2. INSTALL FRONT HOOD MOULDING ASSEMBLY |
Install the front hood moulding assembly with the 7 nuts.