CANISTER (for TMC, TMMR Made) > INSPECTION |
| 1. INSPECT CHARCOAL CANISTER ASSEMBLY |
Visually check the charcoal canister.
Visually check the charcoal canister for cracks or damage.
Check charcoal canister airflow.
![]() |
Using a vacuum pump, check that air flows through the canister according to the instructions below.
| Measurement Condition | Specified Condition |
| Block port B and C and apply 2 kPa (15 mmHg, 0.591 in.Hg) of vacuum into port A. | There are no leaks. |
| Block port C and apply 2 kPa (15 mmHg, 0.591 in.Hg) of vacuum into port A. | Air is sucked into port B. |
| Block port C and blow 5 kPa (0.1 kgf/cm2, 0.7 psi) of air into port A. | Air comes out of port B. |
| Blow 5 kPa (0.1 kgf/cm2, 0.7 psi) of air into port A. | Air comes out of port B and C. |
| 2. CLEAN FILTER IN CANISTER |
![]() |
Clean the filter by blowing 5 kPa (0.1 kgf/cm2, 0.7 psi) of compressed air into port A while holding port B closed.
| *a | Air |