Home › Engine / Hybrid System ยท 6AR-FSE › ENGINE MECHANICAL › DRIVE BELT

DRIVE BELT > INSTALLATION

for Preparation Click here



1. INSTALL V-RIBBED BELT


    A337564E01
  1. Set the V-ribbed belt onto each part as shown in the illustration except the engine water pump pulley.
    Text in Illustration 
    *1
    Crankshaft Pulley
    *2
    V-ribbed Belt Tensioner Assembly
    *3
    Generator Assembly
    *4
    Engine Water Pump Assembly
    *5
    Compressor Assembly with Pulley

  1. Loosen the V-ribbed belt by turning the belt tensioner clockwise.

  1. Set the V-ribbed belt onto the engine water pump pulley.

    NOTICE:
    Make sure that the V-ribbed belt is securely fitted into the grooves of each pulley.



2. INSTALL FRONT FENDER APRON SEAL RH
  1. Install the front fender apron seal RH with the 2 bolts and clip.



3. INSTALL ENGINE UNDER COVER RH
  1. Install the engine under cover RH with the 3 screws and 3 clips.



4. INSTALL FRONT WHEEL OPENING EXTENSION PAD RH
  1. Install the front wheel opening extension pad RH with the 3 screws.



5. INSTALL FRONT WHEEL RH

Torque:
103 N*m{ 1049 kgf*cm , 76 ft.*lbf }