CYLINDER HEAD > REPLACEMENT |
| 1. REPLACE INTAKE VALVE GUIDE BUSH |
Heat the cylinder head sub-assembly to approximately 80 to 100°C (176 to 212°F).
Place the cylinder head sub-assembly on wooden blocks.
![]() |
Using SST and a hammer, tap out the intake valve guide bush.
![]() |
Using a caliper gauge, measure the intake valve guide bush bore diameter of the cylinder head sub-assembly.
| Bush Size | Bush Bore Diameter |
| STD | 10.333 to 10.344 mm (0.40681 to 0.40724 in.) |
| O/S 0.05 | 10.383 to 10.394 mm (0.40878 to 0.40921 in.) |
Heat the cylinder head sub-assembly to approximately 80 to 100°C (176 to 212°F).
![]() |
Using SST and a hammer, tap in the selected intake valve guide bush.
| *a | Protrusion Height |
![]() |
Using a sharp 5.5 mm reamer, ream the intake valve guide bush to obtain the standard oil clearance.
| 2. REPLACE EXHAUST VALVE GUIDE BUSH |
Heat the cylinder head sub-assembly to approximately 80 to 100°C (176 to 212°F).
Place the cylinder head sub-assembly on wooden blocks.
![]() |
Using SST and a hammer, tap out the exhaust valve guide bush.
Using a caliper gauge, measure the exhaust valve guide bush bore diameter of the cylinder head sub-assembly.
| Bush Size | Bush Bore Diameter |
| STD | 10.333 to 10.344 mm (0.40681 to 0.40724 in.) |
| O/S 0.05 | 10.383 to 10.394 mm (0.40878 to 0.40921 in.) |
Heat the cylinder head sub-assembly to approximately 80 to 100°C (176 to 212°F).
![]() |
Using SST and a hammer, tap in the selected exhaust valve guide bush.
| *a | Protrusion Height |
![]() |
Using a sharp 5.5 mm reamer, ream the exhaust valve guide bush to obtain the standard oil clearance.
| 3. REPLACE RING PIN |
Remove the 2 ring pins.
![]() |
Using a plastic hammer, tap in 2 new ring pins to the cylinder head sub-assembly.
| *a | Protrusion Height |