Home › Engine / Hybrid System ยท 6AR-FSE › ENGINE CONTROL › CAMSHAFT OIL CONTROL SOLENOID

CAMSHAFT OIL CONTROL SOLENOID > ON-VEHICLE INSPECTION

for Preparation Click here



1. INSPECT CAMSHAFT TIMING OIL CONTROL SOLENOID ASSEMBLY
  1. Connect the GTS to the DLC3.

  1. Start the engine.

  1. Turn the GTS on.

  1. Enter the following menus: Powertrain / Engine / Active Test / Control the Intake VVT OCV Duty Ratio Bank 1 / Data List / Gas Intake Control / Intake VVT Change Angle Bank 1.

  1. Read the Data List while performing the Active Test with the engine idling.

    OK:
    GTS Operation
    Intake VVT Change Angle Bank 1
    -100% to 100%
    Varies by 75°FR or higher