Home › Engine / Hybrid System ยท 6AR-FSE › ENGINE CONTROL › INTEGRATION RELAY

INTEGRATION RELAY > INSTALLATION

for Preparation Click here



1. INSTALL NO. 1 INTEGRATION RELAY
  1. Connect the 4 No. 1 integration relay connectors.

  1. Engage the 2 claws to install the No. 1 integration relay to the engine room relay block and junction block assembly.

  1. Connect the No. 1 integration relay connector.



2. INSTALL NO. 1 RELAY BLOCK COVER