Home › Drivetrain › K120 (CVT) › TCM › from 2021.02
RM33A0E _52 Drivetrain _098634 K120 CVT _0461792 TCM A

K120 CVT  TCM  INSTALLATION  


PROCEDURE

Hide 89539N 1.INSTALL NO. 2 TRANSMISSION CONTROL ECU BRACKET

a.

Install the No. 2 transmission control ECU bracket to the TCM with the 2 screws.

Torque:
5.8 N*m (59 kgf*cm, 51 in.*lbf)


Hide 89539M 2.INSTALL NO. 1 TRANSMISSION CONTROL ECU BRACKET

a.

Install the No. 1 transmission control ECU bracket to the TCM with the 2 screws.

Torque:
5.8 N*m (59 kgf*cm, 51 in.*lbf)


Hide 89535B 3.INSTALL TCM

a.

Install the TCM to the continuously variable transaxle assembly with the 2 bolts.

Torque:
13 N*m (133 kgf*cm, 10 ft.*lbf)


b.

Engage the clamp.


c.
C413838C01
0,0 0,0 false
V113147

Rotate in this Direction


Connect the TCM connector and rotate the lever and engage the claw.

HINT:

Rotate the lever until the claw of the TCM connector makes a click sound.



d.

Connect the engine wire to the No. 2 transmission control ECU bracket with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 53737B 4.INSTALL FRONT FENDER APRON SEAL LH

Hide 5.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Hide 6.PERFORM INITIALIZATION