Home › Engine / Hybrid System › M20A-FKS (COOLING) › FLOW SHUTTING VALVE (for Heater) › from 2021.02
RM33A0E _51 Engine / Hybrid System _098633 M20A-FKS COOLING _0461856 FLOW SHUTTING VALVE(for Heater) G

M20A-FKS COOLING  FLOW SHUTTING VALVE(for Heater)  INSPECTION  


PROCEDURE

Hide 16260 1.INSPECT FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY)

a.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
1 - 2 20°C (68°F) 22 to 28 Ω


If the result is not as specified, replace the flow shutting valve (water by-pass hose assembly).