Home › Engine / Hybrid System › A25A-FXS (EMISSION CONTROL) › CANISTER (w/ Canister Pump Module)
RM33C0E _51 Engine / Hybrid System _065422 A25A-FXS EMISSION CONTROL _0322967 CANISTER(w/ Canister Pump Module) G

A25A-FXS EMISSION CONTROL  CANISTER(w/ Canister Pump Module)  INSPECTION  


PROCEDURE

Hide 77740 1.INSPECT CANISTER (CHARCOAL CANISTER ASSEMBLY)

a.
A405787

Visually check the canister (charcoal canister assembly).

i.

Visually check the canister (charcoal canister assembly) for cracks or damage.

If cracks or damage are found, replace the canister (charcoal canister assembly).



b.

Check the canister (charcoal canister assembly) operation.

i.
A405788C01
2.573,1.438 2.573,1.813 true 0.604,1.219 0.604,1.594 true 2.271,0.781 2.479,0.781 2.479,0.781 2.76,1.167 true 2.51,1.813 2.729,2.031 0.219,0.219 10 false *a 0.521,1.615 0.74,1.823 0.219,0.208 10 false *b 2.104,0.698 2.323,0.906 0.219,0.208 10 false *c 3.24,1.167 3.406,1.375 0.167,0.208 10 false *d
*a Vent Line Port
*b Air Line Port
*c Purge Line Port
*d Air


With the purge line port closed, blow 0.5 kPa (0.005 kgf/cm2, 0.1 psi) of air into the vent line port, and check that air flows from the air line port.

If the result is not as specified, replace the canister (charcoal canister assembly).


ii.
A405789C01
0.625,1.219 0.625,1.615 true 2.563,1.417 2.563,1.813 true 3.115,0.938 2.958,0.938 2.958,0.938 2.781,1.167 true 2.49,1.802 2.698,1.99 0.208,0.188 10 false *a 0.563,1.635 0.75,1.875 0.188,0.24 10 false *b 3.146,0.844 3.365,1.042 0.219,0.198 10 false *c 0.042,1.271 0.229,1.458 0.188,0.188 10 false *d
*a Vent Line Port
*b Air Line Port
*c Purge Line Port
*d Air


With the vent line port closed, blow 0.5 kPa (0.005 kgf/cm2, 0.1 psi) of air into the air line port, and check that air flows from the purge line port.

If the result is not as specified, replace the canister (charcoal canister assembly).



c.

Check for air leaks.

i.
A405790C01
2.135,1.042 2.313,1.042 2.313,1.042 2.51,1.375 true 3,1.938 2.802,1.938 2.802,1.938 2.646,2.208 true 1.865,2.042 2.042,2.042 2.042,2.042 2.323,1.615 true 0.615,1.406 0.615,1.823 true 0.198,1.021 0.385,1.021 0.385,1.021 0.656,1.24 true 3.021,1.854 3.25,2.063 0.229,0.208 10 false *a 1.708,1.958 1.896,2.135 0.188,0.177 10 false *b 0.531,1.833 0.771,2.031 0.24,0.198 10 false *c 1.979,0.969 2.167,1.135 0.188,0.167 10 false *d 0.042,0.948 0.229,1.125 0.188,0.177 10 false *e
*a Pressure Gauge
*b Vent Line Port
*c Air Line Port
*d Purge Line Port
*e Leak Detection Pump Sub-assembly Connector


Connect a pressure gauge to the vent line port.


ii.

With the purge line port, air line port and leak detection pump sub-assembly connector closed, apply 20 kPa (150 mmHg, 5.91 in. Hg) of pressurized air into the vent line port, then confirm that pressure is maintained for 1 minute.

If the result is not as specified, replace the canister (charcoal canister assembly).



d.

Check the leak detection pump sub-assembly.

i.
A405791

Connect a positive (+) auxiliary battery lead to terminal 5 and a negative (-) auxiliary battery lead to terminal 1.


ii.

Check that a clicking sound is heard from the leak detection pump sub-assembly.

If the result is not as specified, replace the leak detection pump sub-assembly.